Skip to content
Trango Windows & Doors
About Trango

The people behind the frame.

Measured, installed and warranted in Australia.

Trango Australia specifies, fits and stands behind every system we supply. Behind it sits a manufacturer that has done nothing but aluminium windows, doors and facades for twenty-eight years.

Australia

Trango

Windows & Doors

What We Do

The job is ours
end to end.

Trango Australia is the local company. One team measures the opening, specifies the system, manages manufacture, installs it and warrants the finished work.

Talk to our team

Our responsibility to your project

Every opening
Measured on site, with the details of your build in view.
Every specification
Selected for orientation, wind rating and council requirements.
Every installation
Fitted and sealed by our team, with compliance documentation supplied.
After installation
The installation and its warranty remain our responsibility.
The Manufacturer

A specialist, not a
general fabricator.

The manufacturing arm was founded in 1998 and has spent twenty-eight years on aluminium windows, doors and building facades. It has never made anything else.

It holds both a Class A facade engineering design qualification and a Class 1 facade contractor qualification. Few companies in the industry hold the two together, and the design work and the build work are certified separately.

It has contributed to more than forty national and industry standards for windows, doors and facades, and holds over eighty patents: seven invention patents, seventy-three utility models and one design patent.

Some of that work fed back into the standards the industry now builds to.

Founded
1998
Annual capacity
1.5 million m²
Production lines
12
Engineers on staff
80+
Projects delivered
1,000+
Accreditations
ISO 9001, ISO 14001
Certification

Built for Australian
conditions.

Every system in the range is certified to AS 2047, the mandatory standard for windows and external glazed doors in Australian buildings.

Testing is carried out by NATA-accredited laboratories under ISO/IEC 17025 and by Intertek, covering wind pressure, water penetration, air infiltration, deflection and ultimate strength. The current StandardsMark licence, SMK41714, runs to September 2030.

We do not advertise a WERS rating, because none exists for these systems. Every performance figure on this site is a tested result. Every system has been tested and has a report behind it; where a figure is not shown here, the report still exists and we will send it on request.

Product certification covers what leaves the factory and excludes installation. That is normal for a product certificate. The installation, and the warranty on it, are ours.

See the certificates

Quality control, five stages

  1. 01Incoming materials: profile, glass, hardware and sealant sampled on arrival
  2. 02In-process checks at cutting, corner crimping and glue injection
  3. 03Semi-finished sampling
  4. 04100% inspection of finished goods: dimensions, air tightness, water tightness, finish
  5. 05Export packing check: reinforced crating designed for sea freight

Customers are welcome to inspect at the factory, and third-party inspection is supported.

Our Process

From drawings
to installed.

We work with architects, builders and homeowners from the first measure to the final install.

  1. 01

    Consult

    We review your drawings, orientation and energy targets with your team.

  2. 02

    Specify

    Systems, glazing and finishes selected against AS 2047 and NatHERS.

  3. 03

    Fabricate

    Frames cut, thermally broken and glazed to the approved specification.

  4. 04

    Install

    Fitted and sealed on site, with compliance documentation supplied.

How We Work

What you can hold us to.

  • One point of accountability

    The measure, the install and the warranty are all ours. No gap between supplier and installer for a problem to fall into.

  • Tested, not asserted

    Performance figures come from NATA-accredited laboratories, and we publish a number only where we can show the report behind it. Ask for any system's report and we will send it.

  • Certified to AS 2047

    The mandatory standard for windows and external glazed doors in Australian buildings, on every system we supply.

  • Checked at five stages

    From incoming materials to a 100% inspection of finished goods before packing.

  • Documented

    Certificates and test reports are sent on request, and compliance documentation is supplied with the installation.

Open-plan living space with full-height glazing to the garden
Start a project

Your vision.
Beautifully framed.

Send your drawings and energy targets. We will specify the systems and return a written proposal.

Request a Consultation

One point of contact, from measure to install.

A written response within one business day.